PRAIRIE VIEW Elementary

A Replacement School is Proposed as Part of This Bond

 

Proposition A:

A NEW CAMPUS IS PROPOSED FOR PRAIRIE VIEW Elementary

  • Could Open by the 2026-2027 School Year

  • Capacity for 850 Students

  • The new school will be constructed on the existing site, with the entrance off Chisholm Creek Parkway to reduce traffic on FM 3433.

  • Improved Learning Environments to Align with Other New NISD Elementary Schools

  • Based on Elementary Prototype Design

Using a prototype allows the district to save money on design, create equity between campuses, and establish continuity in learning and instructional spaces.

CURRENT Prairie View ELEMENTARY TO BE CONVERTED TO Early Childhood Center

  • The existing Prairie View Elementary School site would be repurposed as a new Early Childhood Center.

Proposition C:

TECHNOLOGY DeviceS

  • Device Refresh for Students and Teachers


About Existing PRAIRIE VIEW Elementary

  • Opened in 1998

  • Core spaces and infrastructure are not designed to hold the current capacity needs and keep up with growth.

  • Hallways/corridors are not designed to handle a larger capacity.

  • Building infrastructure such as water and sewer systems are not designed to handle a larger capacity.

  • Parking is inadequate for current enrollment and future projections.

  • Higher capacity schools increase efficiency of staffing and operational costs at each campus.  

  • The Prairie View Elementary site will be repurposed for an Early Childhood Center.

Rendering of an elementary school. NISD Prototype Elementary School Design

NISD Prototype Elementary School Design