PRAIRIE VIEW Elementary
A Replacement School is Proposed as Part of This Bond
Proposition A:
A NEW CAMPUS IS PROPOSED FOR PRAIRIE VIEW Elementary
Could Open by the 2026-2027 School Year
Capacity for 850 Students
The new school will be constructed on the existing site, with the entrance off Chisholm Creek Parkway to reduce traffic on FM 3433.
Improved Learning Environments to Align with Other New NISD Elementary Schools
Based on Elementary Prototype Design
Using a prototype allows the district to save money on design, create equity between campuses, and establish continuity in learning and instructional spaces.
CURRENT Prairie View ELEMENTARY TO BE CONVERTED TO Early Childhood Center
The existing Prairie View Elementary School site would be repurposed as a new Early Childhood Center.
Proposition C:
TECHNOLOGY DeviceS
Device Refresh for Students and Teachers
About Existing PRAIRIE VIEW Elementary
Opened in 1998
Core spaces and infrastructure are not designed to hold the current capacity needs and keep up with growth.
Hallways/corridors are not designed to handle a larger capacity.
Building infrastructure such as water and sewer systems are not designed to handle a larger capacity.
Parking is inadequate for current enrollment and future projections.
Higher capacity schools increase efficiency of staffing and operational costs at each campus.
The Prairie View Elementary site will be repurposed for an Early Childhood Center.